KP ARCHITECTS

  • | PROFILE |
  • | PROJECTS |
  • | UNBUILT |
  • | MEDIA |
  • | CONTACT |
Menu
  • PROJECTS
  • UNBUILT
  • CONTACT
  • PROFILE
  • MEDIA
  • Blog-Sand1
  • Blog-Sand2
  • Blog-Sand4
  • Blog-Sand3
  • Blog-Sand5

Sandstone on Site #2

/

October 22, 2014

/ kparch

It was a rather miserable October day to be heading to Bribie Island for our site visit this week, but that certainly didn’t dampen our enthusiasm to see what’s been going on since last we visited. The form of the building is really taking shape now, with all the framing in place.

Under Construction / architecture, hospitality, sandstone point

Post navigation

Older Newer

Comments are closed.

Share This Post

Follow Us on Social Media

Recent Posts

  • Sandstone Point Hotel AHA Winner
  • Major Renovation of Sydney Pub
  • Visiting an “Old Friend”
  • Adelaide Refurb
  • Finishing Touches at 3 Chimney House

Post Categories

  • architecture media
  • Built Work
  • Hospitality
  • Hospitality Architecture Interior
  • Miscellaneous Postings
  • On the Drawing Board
  • residential architecture
  • Speculative
  • Under Construction

Archived Posts

KP Architects Pty Ltd  |  43 Doggett Street Teneriffe Brisbane QLD 4005  |  PO Box 2285 Fortitude Valley QLD 4006  |  07 3216 1466  |  admin@kparchitects.com.au  |  © 2023